Design and Build of 120 million litres per day (“MLD”) and 28 MLD Membrane Water Treatment Plant

On 28 April 2016, Konsortium Amanie was awarded a contract from the State Government of Terengganu for the design and build of 120 million litres per day (“MLD”) and 28 MLD membrane water treatment plant, intakes, service tank, installation of raw water and clean water pipes, retrofitting and other works for the Kuala Terengganu Utara Water Supply Scheme for the total sum of approximately RM1.306 billion.

Serba Dinamik acquired 40% interest in Konsortium Amanie, and in return it is awarded with the EPCC works under the Project amounting to RM289.7 million. Currently Serba Dinamik has completed the procurement and commissioning of a portable 3MLD water treatment that had been operational for almost a year now while the rest of the project remains under construction. Its portability is of great importance as it helps alleviate temporary regional shortages, especially during festive seasons.

 

ProjectWater Treatment Plant
Locationin Terengganu, Malaysia
Development OverviewDesign and Build of 120 million litres per day (“MLD”) and 28 MLD Membrane Water Treatment Plant, Intakes, Service Tank, Installation of Raw Water and Clean Water Pipes, Retrofitting and other works for the Kuala Terengganu Utara Water Supply Scheme